Întâlniri ale Grupului de Lucru Evaluare-Extins
2011
30.11.2011
- Awareness raising presentations at OP Monitoring Committees meetings
- The strategic report
- Counterfactual Impact Assessment- workshop
- Good governance
- International evaluation conference- concept
26.10.2011
- Competitiveness
- Regulations for the next programming period
- Evaluation Network Workshop
- Interim Evaluation Guidelines
- Counterfactual Impact Assessment Guidelines
05.09.2011
- Presentation of the Guidelines for the Interim Evaluations of the Operational Programmes
- Discussions on a brochure about the usefulness of evaluation
28.07.2011
- Conflict of interest in evaluation assignments
- Learning Needs Analysis. Training program
- Organisation of an international conference on evaluation
- Interim evaluation workshop (part IV)
30.06.2011
- Concepts and idea regarding monitoring and evaluation post- 2013
- Usefulness of evaluation- brochures and presentations for the Monitoring Committees
- Learning Needs Analysis
- Interim evaluation workshop (part III)
26.05.2011
- The Structural Instruments Evaluation System (SIES)- an overview. Tacit knowledge
- Continuous Learning Strategy for SIES
- Evaluability assessment
- Interim evaluation workshop (part II)
21.04.2011
- Concepts and ideas regarding monitoring and evaluation in the practice of the European Cohesion Policy in the post- 2013 programming period
- The Structural Instruments Evaluation System Analysis Report- remarks
- Workshop- Preparing the 2012 interim evaluations (part I)
28.03.2011
- Presentation of the Synthesis of OP Evaluations Report
- Presentation of the www.evaluare-structurale.ro website
- Training needs analysis for the members of the Evaluation Steering Committees
- Presentation of the programming and measurement in the post- 2013 programming period
22.02.2011
- Plan of priority measures for strengthening the absorbtion capacity of structural and cohesion funds
- Structural Instruments Evaluation Systems- evaluation capacity in other EU member states, efficency and effectiveness
- Draft Desk Research Analysis Report on the current state of the Romanian Evaluation System
18.01.2010
- Main outcomes of the Monitoring Committees meetings related to evaluation
- Results of the interim evaluation of the Operational Programme for Technical Assistance related to KAI 1.2 “Evaluation
- Presentation of the draft Inception Report for the project “Developing the evaluation capacity of the evaluation units of the MAs and ACIS”
- Requirements and methodology for the Analysis of the Current Evaluation System
- Current status of the evaluation activities
2010
15.10.2010
- Introduction. Approval of the minutes of the previous EWG meeting (ECU)
- Implementation of evaluation activities: state of play. Evaluations proposed for the next period of time (ECU)
- Meeting of the Evaluation Network of DG Regio. Presentation of the participation in the conference „Evaluation for public purpose: participation, politics and policies”, Prague, 6– 8 October (ECU)
- Presentation of the participation in Open Days 2010. Discussions/Conclusions (MA and ECU)
- Miscellaneous: amending of Operational Programmes and strategic environment evaluation (ECU), remarks on Annual Implementation Report in terms of evaluation, etc.
14.07.2010
- Introduction. Review of the previous EWG meeting (ECU)
- Outputs of Monitoring Committees meetings in terms of Evaluation. Conclusions (MA and ECU)
- Lessons learned from the evaluations performed. Conclusions (MA and ECU)
- Evaluations proposed for the next period of time (MA and ECU)
- Presentation of the participation in the meeting of the Partnership for ESF Evaluation & Working Group on European Employment Strategy, Brussels, 8 June 2010 (ECU)
- Presentation of the participation in the conference „Ex-post and ongoing evaluations of EU development programmes”, Budapest, 6–7 May (ECU)
- Presentation of the participation in the conference „Shaping the future for the European Social Fund – ESF and Europe in 2020”, Brussels, 23-24 June 2010 (ECU)
25.05.2010
- Introduction. Review of the previous EWG meeting (UCE)
- Implementation of interim evaluations: state of play. Presentation of Evaluation Reports for finalised evaluations.
- MA of SOP Transport
- MA of SOP IEC
- MA of SOP HRD
- ACSI (evaluation of NSRF and OPTA)
- SOP Environment
- OP ACD
- Territorial Cooperation Programmes
- Proposals regarding improvement of ToRs for evaluations
- Presentation of participation in the conference „Ex-post and ongoing evaluations of EU development programmes”, Budapest, 6–7 May (ECU)
29.03.2010
- Introduction. Approval of the minutes of the previous EWG meeting (ECU)
- Presentation of the results of the focus-group regarding OPTA support for SI evaluation and EWG activity (Key Expert OPTA Interim Evaluation)
- Synthesis Report: introduction (ECU)
- Synthesis Report: methodology, workplan, implementation timeplan (Key Expert)
- Discussions on Synthesis Report (MA and UCE)
22.02.2010
- Introduction. Approval of minutes of the previous EWG meeting (ECU)
- Focus Group – Evaluating the members' perception of EWG effectiveness and the impact of OPTA support for EWG activities (Key Expert in charge of OPTA interim evaluation)
- Outputs of DG Regio Annual Meeting in terms of evaluation. Discussions (ECU)
- Problems faced in implementing evaluations (MA and ECU)
- Synthesis Report: consultation on ToRs (ECU)
- Medium-term prospects (2010 -2011) (MA and ECU)
- Input for preparing the bilateral meeting DG Regio – ECU of 24 February (MA and ECU)
2009
23.11.2009
- Monitoring Committees results related to evaluation
- Evaluation methodologies proposed in the technical offers for SOP T, IEC SOP, HRD SOP, NSRF and OPTA
- Lessons learned from the first interim evaluation (ROP)
- Miscellaneous
12.10.2009
- Presentation of the evaluation activities undertaken under contract “Interim evaluation of the Regional Operational Programme for the period of 01.01.2007 - 30.06.2009
- Presentation of the evaluation activities to be undertaken under contract „Technical Assistance for IEC SOP MA for the 2009 interim evaluation of IEC SOP”
- Presentation of the evaluation activities to be undertaken under contract „Technical Assistance for the interim evaluation of SOP Transport 2007-2013”
- Report on the Evaluation Network Meeting, 21-22 Sept., Bruxelles
- Presentation on the Opne Days , 5-8 Oct
- Status of the projects prepared by ECU, financed from OPTA
19.06.2009
- Monitoring Committees results related to evaluation
- Status on the interim evaluations
- Report on the ESF Evaluation Partnership Meeting, 17-18 Jun, Bruxelles
- Discussions on the evaluation report „Efficiency: unitary costs in major projects”
- Discussions on the evaluation report „Study on the management and implementation systems”
23.04.2009
- Status on the interim evaluations
- Proposal on Working Document no. 7
- Report on the Evaluation Network Meeting- 2-3 Apr., Bruxelles
- Report on the ESF Evaluation Partnership Meeting- 11 Mar, Bruxelles
- Presentation on the participation to the international conference “Evaluation of European Funds: improving quality and use”, 26-27 Mar, Vilnius
- Status of the projects prepared by ECU, financed from OPTA
- EVALROM presentation
2008
9- 10.12.2008
- DG Regio – Evaluation Unit Message
- Evaluation in Romania - National Evaluation Strategy and its implementation
- Main results from the last round of the Monitoring Committees meetings in connection to evaluation and status of preparation for evaluations in 2009
- Progress with revision of indicators and the cost-benefit analysis
- Presentation and discussion of the Terms of Reference for the strengthening of the Structural Instruments evaluation function
- Presentation and discussion on the Guidelines for reporting on the evaluation activities to the monitoring committees
- Presentation and discussion on DG Employment’s Paper on evaluation of gender mainstreaming
- How could regional policies goals be evaluated?
14.07.2008
- Structural Instruments Evaluation System in Polland.
- Preparation of the terms of references. Implementing evaluations
- Methodology. Preparing the technical offer for evaluation projects
6.06.2008
- Terms of reference: evaluation of the Romanian system for the implementation of Structural Instruments
- Terms of reference: evaluation of quality and relevance of quantifying objectives (i.e. availability of data and indicators )
- Terms of reference: evaluation of information and publicity measures
15.02.2008
- Multi-Annual evaluation plans: status of their elaboration and approval
- Organising evaluations in 2008: annual evaluation plan, elaboration of terms of references, preparing the tender dossier, implementing evaluations
- Presentation of the project prepared by the Evaluation Central Unit to be funded from OPTA
- Elaboration of the National Guide on Cost-Benefit Analysis
- Monitoring and evaluation indicators: indicative list and reporting models
- Presentation of the training sessions to be organised within the contract „Phare Interim Evaluation Scheme”
2007
04.10.2007
- Evaluation capacity building- main activities undertaken until present
- Evaluation capacity development
- Evaluation procedures manual
- Status of the evaluation plans
- Ex-ante evaluation of the Framework Implementation Documents
12.04.2007
- Cost-Benefit Analysis
- The standard structure of the multi-annual evaluation plans
- The standard text on monitoring and evaluation within the OPs
- SMIS
30.01.2007
- Presentation of the multi-annual evaluation plans of SOP T, SOP E, SOP IEC, SOP HRD, ROP, SOP CDA, CBC, OPTA, NSRF
2006
28.11.2006
- Review of the final draft of the Evaluation procedures Manual
- Multi-annual evaluation plans of the operational programmes
- Review of the Evaluation chapter within the Operational Programmes
- DG Regio Evaluation Network meeting
24.10.2006
- Review of the final draft of the Evaluation procedures Manual
- Multi-annual evaluation plans of the operational programmes
- DG Regio Evaluation Network meeting
05.09.2006
- Ex-ante evaluation- quality control of the ex-ante evaluation report
- Ex-ante evaluation of the Irish CSF 2000-2006
- Quality control of the interim evaluation reports
20.07.2006
- Ex-ante evaluation
- Evaluation procedures
- Presentation of the results of the study on the Evaluation Culture in Romania
15.06.2006
- Training of the evaluation staff within the managing authorities of the 2007-2013 OPs (third part)
- Proposal for a mandate for the evaluatrion units within the managing authorities and the job description of their staff
- Progress of the analysis of the evaluation culture in Romania
18.05.2006
- Training of the evaluation staff within the managing authorities of the 2007-2013 OPs (second part)
- Proposal for a mandate for the evaluatrion units within the managing authorities and the job description of their staff
- Awareness raising plan on evaluation (updated)
12.04.2006
- Training of the evaluation staff within the managing authorities of the 2007-2013 OPs (first part)
- Progress of the analysis of the evaluation culture in Romania
- Awareness raising plan on evaluation
- Approval of the EWG mandate, of the evaluation model, of the evaluation standards
22.02.2006
- EWG mandate
- National Strategy for Evaluation
- Evaluation standards
- Proposal for the organisation of the evaluation function
- Action plan for 2006
- Operational programmes and evaluation
http://www.evaluare-structurale.ro/index.php/ro/grupul-de-lucru-evaluare/intalniri/47-grupul-de-lucru-evaluareintalniri